(BEFORE & AFTER)

 Bathroom installation consisting of removal of old suite and all plasterboard / tiles ,re-board all the walls ,plaster ceiling and paint, porcelain wall and floor tiles with glass mosaic feature strip and mosaic bath panel ( inc access panel )  . Build false stud wall to conceal pipework and concealed cistern, fit wall hung toilet and basin with wall mounted taps ,designer towel rail,high pressure grohe digital mixer valve with ceiling mounted fixed and arm, and folding chrome bathscreen