En-suite Installation works consisted of remove existing fittings, tiles, board, ceiling and stud wall. Build new stud wall to make room larger and to accommodate new bath in location, reboard all walls ,skim ceiling and paint matt white, move doorway location for larger shower area,tile all walls and floor in natural stone including mosaic feature strip in shower area ,fit toilet / basin and unit /illuminated led mirror/ heated towel rail in new locations, fit new bath and walk in shower enclosure with dual outlet pumped digital shower valve.